BuildingFinishing(ThirdRound)forNewNassiriyaDepotProject
Tenderreference:ITC-PB-NAS-SUB-****-****-**
1INTRODUCTION
ThisRFTdocumentisissuedtosubcontracttheBuildingFinishing(ThirdRound)(WORK)fortheEngineering,ProcurementandConstruction(EPC)fornewNassiriyaDepotProject.
1.1ChinaPetroleumPipelineEngineeringCompanyLimited-IraqBranch(“CPP”)has,issuedthisRequestforTender(“RFT”)toselectedbidders(eacha“Bidder”)inordertoobtainbidsubmissionsinrelationtotheprojectdescribedinbriefinparagraph3belowandinmoredetailinthescopeofworksetoutinAppendix6tothisRFT(“ScopeofWork”).
1.2FollowingsubmissionoftheBids,CPPmayselectoneormoreBidder(s)toenterintoalegalagreementwithCPPintheformsetoutinAppendix**tothisRFT(“Agreement”).TheAgreementshalldetailtheScopeofWork,thetermsandconditionsandagreedfeespursuanttowhichCPPmayengagetheselectedBidder(s)toperformallorpartoftheScopeofWork.
2DEFINITION
ProjectOwner:TheOilProjectsCompany(SCOP)
Tenderee:ChinaPetroleumPipelineEngineeringCompanyLimited-IraqBranch
TenderingAgent:ChinaPetroleumPipelineMaterialandEquipmentCompanyLimited
Bidder:Thesubcontractor/serviceproviderwhowilltakepartintheBidding
3OVERVIEWOFTHEWORK
3.1CPPhasbeenawardedbySCOPtheEPCfornewNassiriyaDepotProject.TheProjectislocatedatNassiriya,Iraq.Projectscopeincludesbutnotlimitedto:
7X**,**0M3CrudeOilTank
2X**,**0M3SurgeReliefTank
2X**,**0M3WaterTank
**KMpipelinesofdifferentsizes
Otherfacilitiesforthetankdepot
3.2BuildingFinishingWorks(ThirdRound)fortheEngineering,Procurement,andConstruction(EPC)oftheNewNassiriyaDepotProject.Theconstructionactivitiesshallinclude,butarenotlimitedto,thefollowingbuildingfinishingworks:
FloorsandSkirting:Installationandfinishingoffloorsandskirtingthroughoutthefacility.
Walls:Constructionandfinishingofbothexternalandinternalwalls.
Ramps,Walkways,andFootsteps:Constructionandfinishingoframps,walkways,andfootstepsasperdesignspecifications.
RoofandCeiling:Installationandfinishingofroofstructuresandceilingsystems.
WindowsandDoors:Supply,installation,andfinishingofwindowsanddoors.
AccessLadders:Installationofaccessladderswhererequired.
WaterSupplyandDrainageSystems:Installationandintegrationofwatersupplyanddrainagesystems.
FireFightingSystems:Installationoffirefightingsystemsincompliancewithsafetystandards.
ElectricalSystems:Installationandfinishingofelectricalsystemsandfixtures.
Fordetailedrequirementsandspecifications,refertoAppendix6ofthisdocument.
Asthisisthethirdtenderandtheworkinterfacehasbeenupdated,pleasereadthescopeofworkcarefully.Forspecificdetails,pleaserefercloselytoAPPENDIX6-ScopeofWork.
3.3SelectedBidderwillbeengagedtocarryouttheBuildingFinishing(ThirdRound)(WORK)fortheEngineering,ProcurementandConstruction(EPC)fornewNassiriyaDepottoenabletheconstructionofabove-mentionedwork.
3.4TheScopeofWorksistobecompletedwithinthetimeframeprovidedbyCPP.
4SUBMISSIONOFBIDDINGDOCUMENTS
4.1BiddingdocumentsshallbecomposedofTWOparts,TechnicalProposal(Un-priced)andCommercialProposal.
Incaseofanyissueneedstobeclarified,pleaseinformtheTendereeinawrittenform(theClarificationTemplateattachedwiththeRFTFiles),andsenttothefollowingemailaddresses:
zhaorui@enlinkenergy.comandCCto********9@qq.com(Mrs.PengYanxin)
Ifthebidderhasanyobjectiontothetechnical,commercialrequirementsinthetenderingdocuments,thebidderisrequestedtoclarifyinwritingtotheTendereewithin7daysofreceiptofthetenderingdocuments,andnoclarificationwillbeacceptedafterthedeadline.IfnoclarificationisprovidedtotheTenderee,itwillbedeemedthatthebiddercanmeetallthetechnicalandcommercialrequirements.TheTendereehastherighttorejectthedeviationitemspointedbyBidderandregardthebiddingdocumentsasunqualified.
4.2AcquisitionofTenderingDocuments
Timeofreceivingthetenderingdocuments(RequestforTender):9:**AMon**thAugust****to5:**PMon6thSeptember****(AbuDhabitime,thesamebelow).
Thosewhointendtoparticipateinthebidding,pleasecontactwithMs.ZhaoRuitoobtainthetenderingdocuments.
Contactperson:MsZhaoRui
Tel:****1-********2
E-mail:zhaorui@enlinkenergy.com
4.3SubmissionofBiddingDocuments
Biddingdocumentsshallbecomposedoftwocomponents,aTechnicalProposal(Unpriced)andaCommercialProposal.
TheTechnicalproposalshallbesubmittedtobiddingtechnical4@enlinkenergy.combefore9:**AM(AbuDhabiTime),9thSeptember****.
TheCommercialproposalshallbesubmittedtobidcommercial4@enlinkenergy.combefore9:**AM(AbuDhabiTime),9thSeptember****.TheCommercialProposalshallbeencrypted.Theencryptedpasswordshallbesenttotheemailboxseparately:********9@qq.com.
Theoverduedeliveryofthebiddocumentswillberejected,andthedeliverytimeshallbesubjecttothetimeofthedesignatedemailID.
4.4ShouldtheBidderfailtosubmitbeforetheaforesaiddeadline,theProposalDocumentswillberejected.Thetimepresentedinthee-mailshallbeconsideredasthesubmissiontime.
4.5Beforethedeadlineindicatedabove,theBidderisentitledtorequesttheTendereetocheckwhethertheproposalshavebeensuccessfullydeliveredtotheassignedemailaddressbysendingtheemailtotheundersign.
4.6Before3daysaheadofthedeadlineindicatedabove,theBidderisentitledtorequesttheTendereetopostponethedeadlinefornomorethan7daysintotalincaseofpuzzles/difficultieshappeningtothevendorsforpreparingthebiddingdocuments.
5BidOpening
Time:9:**AM(AbuDhabiTime),9thSeptember****;
Place:**thFloor,AddaxOfficeTower,AlReemIsland,AbuDhabi,UAE
6TheMediaoftheAnnouncement
Thistenderannouncementisissuedon:https://www.cnpcbidding.com/.
Tenderee:ChinaPetroleumPipelineEngineeringCo.Ltd.IraqBranch
Contactperson:Mrs.PengYanxin
Email:********9@qq.com
TenderingAgent:ChinaPetroleumPipelineMaterialandEquipmentCompanyLimited
Address:**thFloor,AddaxOfficeTower,AlReemIsland,AbuDhabi,UAE
Contactperson:MsZhaoRui
Tel:****1-********2
E-mail:zhaorui@enlinkenergy.com
7BidEvaluationCommitee
Thebidevaluationcommitteeisexpectedtoconsistofatotalof7members,including4technicalevaluatorsand3commercialevaluators(including1commercialevaluatorand1technicalevaluatorfromtheTenderee).Thememberswillbeselectedbasedonarandomdrawprinciple.
8SpecialInstructionstoBidders
7.1TheBiddershallsubmitallrequiredbiddingdocumentsinbothPDFandEditableversiontoconvenientTendereeevaluationwork.
7.2TendereereservestherightoffinalinterpretationforthetenderingdocumentsandconfirmationoftheBuyer.