TenderNotice
招標(biāo)公告
TO all tenders:
致全體投標(biāo)人:
1. Guidance Control Service for this project has met the tenderconditions and is now open for public tender, using electronic tendering andbidding methods. Please log in to Supply Chain Management System of CCCC(http://ec.ccccltd.cn) to complete registration. Please remember the registeredusername and password.
本項(xiàng)目的定位控制服務(wù)采購(gòu)已符合招標(biāo)條件,現(xiàn)采用電子招投標(biāo)方式進(jìn)行公開(kāi)招標(biāo)。請(qǐng)登錄中國(guó)交建供應(yīng)鏈管理系統(tǒng)(http://ec.ccccltd.cn)完成注冊(cè)操作,并妥善保存注冊(cè)所用的用戶(hù)名及密碼。
2.Please download the bidding document through the remote login ofSupply Chain Management System of CCCC (http://ec.ccccltd.cn) fromJune ** ,**** at **:** AM to June ** ,**** at **:** AM .
請(qǐng)于****年6月**日**:**至****年6月**日**:**期間,登錄中國(guó)交建供應(yīng)鏈管理系統(tǒng)(http://ec.ccccltd.cn)下載招標(biāo)文件。
3.Bid Documents should be submitted from June ** ,**** at **:** AM to June **,**** at **:** AM. The tender shallupload the prepared electronic version of the bid document to Supply ChainManagement System of CCCC( http://ec.ccccltd.cn ).
投標(biāo)文件提交時(shí)間為****年6月**日**:**至****年6月**日**:**。投標(biāo)人應(yīng)在上述期間內(nèi)將編制完成的電子版投標(biāo)文件上傳至中國(guó)交建供應(yīng)鏈管理系統(tǒng)(http://ec.ccccltd.cn)。
4.It shall remain your responsibility to ensure that your biddocuments will reach the address above on or before the deadline. BidDocuments that are received by CHEC after the deadline indicated above, for whatever reason, shall not be considered for evaluation.
投標(biāo)人應(yīng)確保其投標(biāo)文件在截止時(shí)間前成功上傳至上述平臺(tái)。無(wú)論因何原因,超過(guò)截止時(shí)間提交的投標(biāo)文件,發(fā)包人中國(guó)港灣將不予受理。
5.We kindly lookforward to your submission of bid documents for Guidance Control Service, thankyou for your cooperation.
我們誠(chéng)摯期待貴方就定位控制服務(wù)提交投標(biāo)文件,并感謝貴方的積極配合。
Please take note of the following requirements and conditionspertaining to the supplyof the mentioned services above:
請(qǐng)注意以下關(guān)于上述服務(wù)采購(gòu)的要求與條件:
Tenderee 招標(biāo)人 | CHINAHARBOUR ENGINEERING COMPANY 中國(guó)港灣工程有限責(zé)任公司 |
Function: 服務(wù)內(nèi)容 | Guidance Control Service forPhilippine Pasay Reclamation Development Project (Phase 1) HydraulicEngineering 菲律賓帕塞吹填開(kāi)發(fā)項(xiàng)目(1期)水工工程定位控制服務(wù) |
Location of Service 服務(wù)地點(diǎn) | ManilaBay 馬尼拉灣 |
Project Description 項(xiàng)目說(shuō)明 | Please refer to Chapter 3 Format of Bid Documents 詳見(jiàn)第三章《投標(biāo)文件格式》 |
Rate 合同類(lèi)型 | Fixed unit price contracts 固定單價(jià)合同 |
Currency of Quotation報(bào)價(jià)幣種 | 菲律賓比索 |
Address of Tender 投標(biāo)地址 | Supply ChainManagement System of CCCC ( http://ec.ccccltd.cn ) 中國(guó)交建供應(yīng)鏈管理系統(tǒng)( http://ec.ccccltd.cn ) |
Deadline for the Submission of Quotation 報(bào)價(jià)提交截止時(shí)間 | FROM June ** ,**** at **:** AM to June ** **** at **:**AM **** 年 6 月 ** 日 **:** 起至 **** 年 6 月 ** 日 **:** 止 |
Language 投標(biāo)語(yǔ)言 | English 英文 |
Documents to Be Submitted 需提交文件 | Please refer to Chapter 3 Format of Bid Documents 詳見(jiàn)第三章《投標(biāo)文件格式》 |
Period of Validity of QuotesStarting from the Submission Date 報(bào)價(jià)有效期 | ** days. 自投標(biāo)文件提交之日起**日內(nèi)有效 |
Payment Terms 付款方式 | Remittance by bank 銀行電匯 |
Currency 付款幣種 | Philippine Peso (PHP) or Euro (EUR).If payment is made in Euro, the exchange rate between Euro and PhilippinePeso shall be based on the official exchange rate published by the CentralBank of the Philippines on the date of payment. 菲律賓比索或歐元,如采用歐元付款,歐元兌菲律賓比索的匯率以付款日當(dāng)天菲律賓央行菲律賓比索兌歐元匯率為準(zhǔn)。 |
Evaluation Criteria 評(píng)標(biāo)標(biāo)準(zhǔn) | Lowest Reasonable Price Method 合理低價(jià)法 |
CHEC Will Award to: 合同授予對(duì)象 | One business firm who meets the requirements 符合要求的唯一中標(biāo)單位 |
Contractual Period 合同期限 | To be confirmed 待確認(rèn) |
The Maximum Bid Price 最高投標(biāo)限價(jià) | PHP **,**8,**0.** (including taxes). The tax rate is **%. **,**8,**0.**菲律賓比索(含稅),適用稅率為**%。超過(guò)該限價(jià)的投標(biāo)將被視為無(wú)效。 |
Annexes to This RFQ 附件 | Please refer to Chapter 3 Format of Bid Documents 詳見(jiàn)第三章《投標(biāo)文件格式》 |